FAQs

Where can I view a Pulse™ Hot Runner Controller tutorial and related information?

Pulse™ Hot Runner Controller - https://fastheatbyspark.com/hot-runner-controllers/pulse-1-180-zones/ Processing - https://fastheatbyspark.com/hot-runner-injection-molding-process/ Energy Savings - https://fastheatbyspark.com/hot-runner-energy-savings/ I/O Integration - https://fastheatbyspark.com/hot-runner-io-integration/ Recipes and Automated Start-Up - https://fastheatbyspark.com/hot-runner-recipe-control/ Real-Time Alarms - https://fastheatbyspark.com/hot-runner-alarm-system/ Diagnostics & Production Readiness - https://fastheatbyspark.com/hot-runner-maintenance/ The HMI tutorial, brochure, comparison guides, I/O guides, VNC Viewer and OPC-UA instructions, quick start guide, and manual can be found here.

2026-07-21T14:30:51+00:00July 21st, 2026||Comments Off on Where can I view a Pulse™ Hot Runner Controller tutorial and related information?

How can I measure hot runner energy savings?

We install a Power Analyzer to collect data on two-second intervals on all three phases. This should be used on each controller being compared under identical conditions (ramp-up, run-time, process temps, etc). 

2026-07-21T15:19:13+00:00July 21st, 2026||Comments Off on How can I measure hot runner energy savings?

What information do you need to specify connectors on a hot runner controller, cables, and mold boxes?

If you have the mold and controller connector drawings, that is ideal. Otherwise, follow the instructions for sending pictures of your hot runner cables: Picture of the T/C cable only, holding both ends of the cable on one picture.     Picture of the heater cable only, holding both ends of the cable on one picture. Note: [...]

2026-06-06T18:30:19+00:00June 6th, 2026|Comments Off on What information do you need to specify connectors on a hot runner controller, cables, and mold boxes?

What is your lead time for make-to-order hot runner controllers?

Our make-to-order lead time for hot runner controllers is typically 4-6 weeks for one or two controllers. Larger orders should be arranged with as much advanced notice as possible. We always ask when you need them and strive to accommodate.

2026-06-06T18:18:31+00:00June 6th, 2026|Comments Off on What is your lead time for make-to-order hot runner controllers?

Do you keep finished hot runner controllers in stock?

Yes, we strive to keep Pulse 30, 60, and 90-zone cabinets in stock, pending installation of the heater and thermocouple connections per the customer's specifications. These can be populated with any quantity of stock dual-zone, 20-amp power modules, or single-zone 30-amp power modules. Please allow 1-2 weeks for shipment.

2026-06-06T18:17:44+00:00June 6th, 2026|Comments Off on Do you keep finished hot runner controllers in stock?
Go to Top